Azizi Developments finalises Mina mission on Palm Jumeirah | Information

Azizi Developments has confirmed practically 94 per cent of the work has been accomplished at its luxurious residential improvement, Mina.

The property is positioned on the east crescent of the long-lasting Palm Jumeirah.

The construction, blockwork and inside plaster are 100 per cent full, whereas the tiling, heating, air flow and air-conditioning, mechanical, electrical and plumbing, façade works, and elevator works are all 99 per cent full.

The swimming pool and total completed at the moment are over 95 per cent full, with exterior works now standing at 80 per cent.

Providing practically 38,500 sq. metres of built-up space, Mina options 178 items, comprising 120 one-bedroom residences, 54 two-bedroom residences, and 4 spacious, lavishly designed penthouses scheduled to be accomplished inside quarter three of 2020, mentioned the assertion from Azizi.

On the important thing achievement, govt director, gross sales and advertising and marketing, Nima Khojasteh mentioned: “Mina, located on the serene east crescent of the eighth surprise of the world – the marvellous archipelago that’s iconic to Dubai, enjoys a excessive demand from each native residents and worldwide traders who worth the approach to life it embodies.

“Seeing this mission being finalised fills us with immense pleasure.

“We sit up for its completion and are thrilled handy over the keys to our valued clients within the coming months,” he said.

The mission embodies a very unique, privileged, and resort-like life-style that enriches the lives of its residents, and is a manifestation of Azizi Improvement’s customer-centricity, consideration to element, and contributions to the event of the United Arab Emirates’ awe-inspiring panorama, he added.




Supply hyperlink

Travel Master

Be the first to comment

Leave a Reply

Your email address will not be published.


*